The City’s Engineering Division has scheduled two separate pavement resurfacing projects listed below. Please note the schedules are tentative:
- April 23 - May 4: Villa Rica Subdivision: from the limits of Federal Hwy. to Dixie Hwy. from NE 32nd Street to Spanish River Blvd.
- May 3 - May 21: Knob Hill: NW 3rd Avenue and NW 4th Avenue north of Spanish River Blvd. Cedar Ridge: NW 35th Street, west of NW 2nd Avenue and NW 35th Street, east of NW 5th Avenue
The City’s roadway network is a critical asset that is managed to maximize the appearance and integrity of the roads. To achieve these goals, the Municipal Services Department has developed a pavement management system program that includes periodic inspections, a uniform methodology to assess pavement conditions and a predictive model to optimize the timing of roadway resurfacing, rejuvenation and reconstruction.
Most recently, residents have seen resurfacing projects on St. Andrews Blvd. between Glades Road and St. Andrews Blvd., in the Por La Mar and Estates Sections east of the intracoastal waterway and along SW 18th Street.
For additional projects and road closure information www.myboca.us/1398/Road-Closures